Wells around the excavation
For open or non-sealed supported excavations: perimeter wells lower the water table across the whole pit.
● dewatering well · contours: drawdown
Lowering groundwater levels to enable excavation in dry conditions and depressurizing deeper aquifers to protect against hydraulic uplift at the excavation base. Within 48 hours, you’ll know how many dewatering wells you need, where to place them, and what flow rates and power supply you’ll need for pumping.
Dewatering solutions
The choice of dewatering system depends on the sequence of soil layers, the groundwater level, the excavation depth, the type of excavation support and the surrounding site conditions. Here are the three most common scenarios.
For open or non-sealed supported excavations: perimeter wells lower the water table across the whole pit.
● dewatering well · contours: drawdown
Diaphragm or secant-pile walls keyed into the impermeable layer: only the water inside is pumped, with low flows and no effect on neighbours.
● internal well · ▬ cut-off wall
When a confined aquifer lies below the excavation: deep wells relieve the water pressure and prevent base heave.
● relief well · ▲ piezometer
Services
We offer competitive rates tailored to the type and complexity of each project.
Based on your geotechnical report and excavation plan, you’ll receive a preliminary dewatering design with estimated quantities so you can request comparable quotes from contractors.
If the design is ordered afterwards, the cost of the analysis is deducted from its price.
The DTAC or complete PTE phase, signed by the designer and verified by a certified technical verifier in the field of AF.
For international investors and entrepreneurs: the same documentation in Romanian and English, with verified technical terminology.
How we work
The structural engineer sets the dewatering duration from the construction schedule; we provide the hydraulic data needed for it.
The geotechnical report, the excavation plan, and any other relevant information (such as technical reports and specifications) that can help identify the most suitable dewatering system.
Solution and quantities within 48 hours of receiving the full report.
At the required stage to HG 907/2016, in Romanian or bilingual.
Uplift and the moment pumping can stop, agreed with the structural engineer.
About us
PFA Cristian Păun designs dewatering and groundwater control works for deep excavations and underground structures.
All dewatering designs are prepared and signed by Cristian Păun, a geological engineer with an engineering degree and a master’s degree in Environmental Geological Engineering, who has been designing dewatering systems since 2002. His experience includes work on the Bucharest Metro, utility networks, deep urban excavations and other types of construction works. Each design is reviewed by a technical verifier certified in Romania for the Af category.
Contact
Send us the documents below and we will reply with a quote for the analysis or the design.
Services for businesses and individuals, quoted on a case-by-case basis.
All technical documents received are treated as confidential, including during the quotation stage.
We reply on the same working day.